Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/60583
Full metadata record
DC FieldValueLanguage
dc.contributor.authorWang, Xiaojun
dc.date.accessioned2014-05-28T08:50:26Z
dc.date.available2014-05-28T08:50:26Z
dc.date.copyright2010en_US
dc.date.issued2010
dc.identifier.urihttp://hdl.handle.net/10356/60583
dc.description.abstractProduction scheduling in company SLB requires significant manual planning power due to the large volume of work orders. SLB is looking for alternatives to replace manual planning with computer planning to save planning costs and realize its investment on Adexa. Adexa is a tool which can generate optimized production schedules for manufacturing companies. This thesis project studies the foundry production scheduling using Adexa in SLB. The available capacity for work centers and production process flows in foundry and stage machining are studied. Adexa model for foundry is built by defining the inputs of the work centers. The inputs are further fine-tuned based on the loading percentage calculations. A test case for foundry is designed to investigate the planning logic of Adexa in balancing the demand with supply. The result shows that Adexa’s planning logic matches the SLB’s manual planning logic. Lastly, results of trial runs of Adexa without capacity constraint are obtained. Feasible solutions are proposed to SLB for the identified implementation challenges of Adexa.en_US
dc.format.extent70 p.en_US
dc.language.isoenen_US
dc.subjectDRNTU::Engineering::Manufacturingen_US
dc.titleFoundry production scheduling by Adexa in an oilfield service companyen_US
dc.typeThesis
dc.contributor.supervisorRohit Bhatnagaren_US
dc.contributor.schoolCollege of Business (Nanyang Business School)en_US
dc.description.degree​Master of Science (IMST)en_US
dc.contributor.organizationSLBen_US
dc.contributor.researchSingapore-MIT Alliance Programmeen_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:SMA Theses
Files in This Item:
File Description SizeFormat 
Xiaojun2010.pdf
  Restricted Access
Main Report1.33 MBAdobe PDFView/Open

Page view(s)

122
Updated on Feb 28, 2021

Download(s)

4
Updated on Feb 28, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.