Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/60661
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Liu, Haoyu | |
dc.date.accessioned | 2014-05-29T04:07:24Z | |
dc.date.available | 2014-05-29T04:07:24Z | |
dc.date.copyright | 2009 | en_US |
dc.date.issued | 2009 | |
dc.identifier.uri | http://hdl.handle.net/10356/60661 | |
dc.description.abstract | Increasing productivity is important in maintaining the competence of a manufacturing company. The project aimed to investigate and analyze factors that could influence throughput and improvement in the performance of a manufacturing system. The objectives are analyzed through a project of AFT company Singapore, an oilfield service company. A simulation model built in Simul8 is developed to simulate the current production performance of a gauge assembly workshop. | en_US |
dc.format.extent | 61 p. | en_US |
dc.language.iso | en | en_US |
dc.subject | DRNTU::Engineering::Manufacturing | en_US |
dc.title | Performance improvement simulation of a manufacturing system | en_US |
dc.type | Thesis | |
dc.contributor.supervisor | Tor Shu Beng | en_US |
dc.contributor.school | School of Mechanical and Aerospace Engineering | en_US |
dc.description.degree | Master of Science (IMST) | en_US |
dc.contributor.organization | AFT Singapore | en_US |
dc.contributor.research | Singapore-MIT Alliance Programme | en_US |
item.fulltext | With Fulltext | - |
item.grantfulltext | restricted | - |
Appears in Collections: | SMA Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Haoyu2009.pdf Restricted Access | Main Report | 1.48 MB | Adobe PDF | View/Open |
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.