Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/60661
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLiu, Haoyu
dc.date.accessioned2014-05-29T04:07:24Z
dc.date.available2014-05-29T04:07:24Z
dc.date.copyright2009en_US
dc.date.issued2009
dc.identifier.urihttp://hdl.handle.net/10356/60661
dc.description.abstractIncreasing productivity is important in maintaining the competence of a manufacturing company. The project aimed to investigate and analyze factors that could influence throughput and improvement in the performance of a manufacturing system. The objectives are analyzed through a project of AFT company Singapore, an oilfield service company. A simulation model built in Simul8 is developed to simulate the current production performance of a gauge assembly workshop.en_US
dc.format.extent61 p.en_US
dc.language.isoenen_US
dc.subjectDRNTU::Engineering::Manufacturingen_US
dc.titlePerformance improvement simulation of a manufacturing systemen_US
dc.typeThesis
dc.contributor.supervisorTor Shu Bengen_US
dc.contributor.schoolSchool of Mechanical and Aerospace Engineeringen_US
dc.description.degree​Master of Science (IMST)en_US
dc.contributor.organizationAFT Singaporeen_US
dc.contributor.researchSingapore-MIT Alliance Programmeen_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:SMA Theses
Files in This Item:
File Description SizeFormat 
Haoyu2009.pdf
  Restricted Access
Main Report1.48 MBAdobe PDFView/Open

Page view(s) 10

120
checked on Oct 25, 2020

Download(s) 10

7
checked on Oct 25, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.