Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/60663
Title: CM-04AB : case study analysis & investigation on contract disputes
Authors: Nah, Nessie Hui Juan
Keywords: DRNTU::Engineering::Civil engineering
Issue Date: 2014
Abstract: The Final Year Project (FYP) studied the use of Security of Payment (SOP) as a form of legislation to expedite payment in the construction industry. Following a period of high insolvency in local construction firms, Parliament had implemented The Building and Construction Industry Security of Payment Act in 2004 (SOPA) which was modelled after a corresponding SOP Act in New South Wales Australia.
URI: http://hdl.handle.net/10356/60663
Schools: School of Civil and Environmental Engineering 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
FYP Final Report.pdf
  Restricted Access
1.14 MBAdobe PDFView/Open

Page view(s)

463
Updated on Mar 21, 2025

Download(s)

17
Updated on Mar 21, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.