Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/60663
Title: | CM-04AB : case study analysis & investigation on contract disputes | Authors: | Nah, Nessie Hui Juan | Keywords: | DRNTU::Engineering::Civil engineering | Issue Date: | 2014 | Abstract: | The Final Year Project (FYP) studied the use of Security of Payment (SOP) as a form of legislation to expedite payment in the construction industry. Following a period of high insolvency in local construction firms, Parliament had implemented The Building and Construction Industry Security of Payment Act in 2004 (SOPA) which was modelled after a corresponding SOP Act in New South Wales Australia. | URI: | http://hdl.handle.net/10356/60663 | Schools: | School of Civil and Environmental Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
FYP Final Report.pdf Restricted Access | 1.14 MB | Adobe PDF | View/Open |
Page view(s)
463
Updated on Mar 21, 2025
Download(s)
17
Updated on Mar 21, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.