Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/60689
Title: Finished goods inventory reduction by advance production control and shipping schedule incorporated planning
Authors: Yang, Jingxia
Keywords: DRNTU::Engineering::Manufacturing
Issue Date: 2009
Abstract: An opportunity for reduction in finished goods inventory level of the Singapore operations of a multi-national food products packaging company was identified during a study of the system in accordance with the World Class Manufacturing philosophy. Changes in planning policy were proposed to remedy the problem and simulation models were used, on the make- to-order, serial production system to test two potential solutions to the problem. The models used showed great promise for reduction in finished goods and annual holding costs. The advance production control and incorporating shipping schedules into the weekly production planning demonstrated significant results in reducing finished goods inventories.
URI: http://hdl.handle.net/10356/60689
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:SMA Theses

Files in This Item:
File Description SizeFormat 
Jingxia2009.pdf
  Restricted Access
Main Report1.59 MBAdobe PDFView/Open

Page view(s)

151
Updated on May 7, 2021

Download(s)

6
Updated on May 7, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.