Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6153
Title: | Finite capacity planning in a discrete manufacturing environment | Authors: | Mayura Belagod Ravichandra Gupta. | Keywords: | DRNTU::Engineering::Manufacturing | Issue Date: | 2003 | Abstract: | The objective of this thesis was to find out reasons as to how the Materials Plan can work in conjunction with a detailed capacity plan, based on Finite Capacity requirements in manufacturing environment, which has many resources that can be operated parallely. | URI: | http://hdl.handle.net/10356/6153 | Schools: | School of Mechanical and Production Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MAE-THESES_631.pdf Restricted Access | 2.41 MB | Adobe PDF | View/Open |
Page view(s) 50
619
Updated on May 5, 2025
Download(s)
2
Updated on May 5, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.