Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6336
Title: | Use of OWAS and fault tree analysis to create a cost/benefit matrix for posture improvement investment | Authors: | Rudi. | Keywords: | DRNTU::Engineering::Industrial engineering::Human factors engineering | Issue Date: | 2005 | Abstract: | This thesis consists of 2 parts. -part b- This project aims to propose a matrix cost/benefit model to present and compare various suggested ergonomics measures based on the estimated cost/benefit. This model is expected to provide quantitative information to help business decision- makers choose and plan ergonomic investment. In order to demonstrate the application of the proposed method, a case study was carried out at a company premise. | URI: | http://hdl.handle.net/10356/6336 | Schools: | School of Mechanical and Aerospace Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MAE-THESES_797.pdf Restricted Access | 12.1 MB | Adobe PDF | View/Open |
Page view(s) 20
715
Updated on Mar 17, 2025
Download(s)
11
Updated on Mar 17, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.