Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/64125
Title: Life cycle assessment of green technology (PV panels)
Authors: Wang, Wei Chao
Keywords: DRNTU::Engineering::Civil engineering
Issue Date: 2015
Abstract: A detailed LCA was conducted on the Zero Energy Building (ZEB) which is developed by BCA. The major focus is to establish a LCA model to understand the hybrid usage of PV panels in ZEB. One of the major step is to identify the Life Cycle Inventory so as to allow easy analysis. Software modelling was used to assess the Life Cycle of the PV panel used in Singapore. Under this modelling scheme, it is possible to use different indicators such as Primary Energy Demand (PED) and Global Warming Potential (GWP) to analyze the amount of potential pollutant released and assess the effectiveness of PV Panel through its Energy Payback Time. Energy Return on Investment can also be calculated based on the Energy Payback Time and the expected lifespan.
URI: http://hdl.handle.net/10356/64125
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
Final Report.pdf
  Restricted Access
1.29 MBAdobe PDFView/Open

Page view(s)

145
checked on Sep 27, 2020

Download(s) 50

20
checked on Sep 27, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.