Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6413
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Sundaramoorthy Ravikumar. | en_US |
dc.date.accessioned | 2008-09-17T11:14:23Z | - |
dc.date.available | 2008-09-17T11:14:23Z | - |
dc.date.copyright | 2002 | en_US |
dc.date.issued | 2002 | - |
dc.identifier.uri | http://hdl.handle.net/10356/6413 | - |
dc.description.abstract | This dissertation concentrates on the critical machines first using forward, backward and ‘forward & backward’ scheduling techniques, which is a different approach from other scheduling systems commercially available. The “scheduling around bottleneck” approach aims to utilize the bottleneck machines to the maximum and leads to higher output. | en_US |
dc.rights | Nanyang Technological University | en_US |
dc.subject | DRNTU::Engineering::Manufacturing::Production management | - |
dc.title | Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) | en_US |
dc.type | Thesis | en_US |
dc.contributor.supervisor | Piplani, Rajesh | en_US |
dc.contributor.school | School of Mechanical and Production Engineering | en_US |
dc.description.degree | Master of Science | en_US |
item.fulltext | With Fulltext | - |
item.grantfulltext | restricted | - |
Appears in Collections: | MAE Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MAE-THESES_866.pdf Restricted Access | 6.33 MB | Adobe PDF | View/Open |
Page view(s) 50
477
Updated on Mar 27, 2024
Download(s)
8
Updated on Mar 27, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.