Title: Management of an underground MRT station construction
Authors: Soh, Kin Meng.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 2000
Abstract: This report describes a study on the various forms of management tools used in the construction of an underground Mass Rapid Transit (MRT) station, the Chinatown Station. The construction of Chinatown Station is considered to be the most difficult amongst the 16 underground MRT stations on the North-East Line. Situated in the midst of "Chinatown"* this area is densely populated and is in one of the oldest parts of Singapore where a number of buildings are to be conserved. The station is located directly beneath two of the busiest roads in Singapore and between buildings that are within 2m from the station perimeter walls. Eu Tong Sen Canal runs between the roads and full flow capacity has to be maintained at all times. In addition, spanning across these roads and the canal sits the "Garden Bridge"", a majestic pedestrian overpass whose bored pile foundations pass through the proposed station box. This bridge will have to be supported and kept open to pedestrians at all times.
URI: http://hdl.handle.net/10356/6590
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_102.pdf
  Restricted Access
11.31 MBAdobe PDFView/Open

Page view(s) 10

633
Updated on Oct 18, 2021

Download(s) 50

28
Updated on Oct 18, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.