Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6606
Title: | Japanese contractor's approaches in managing design and build contract in Singapore | Authors: | Toh, Boo Hor. | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 2003 | Abstract: | The objective of this report is to examine the approach of a famous international Japanese contractor Obayashi in managing a design and build contract in Singapore. The method of cost control, the management of construction schedule, co-ordination between the consultatn and sub-contractors and the quality control methods to achieve the owner's requirements will be clearly described. | URI: | http://hdl.handle.net/10356/6606 | Research Centres: | Centre for Advanced Construction Studies | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_117.pdf Restricted Access | 15.6 MB | Adobe PDF | View/Open |
Page view(s) 5
1,025
Updated on Mar 28, 2024
Download(s)
7
Updated on Mar 28, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.