Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6607
Title: | Factors leading to delays in construction in infrastructure based projects | Authors: | Tong, Tee Hui. | Keywords: | DRNTU::Engineering::Civil engineering::Construction management | Issue Date: | 2003 | Abstract: | The report describes an analysis programme conducted on road and infrastructure projects in Singapore. A survey was conducted on a sample of Project Management and Contract Administration individuals from various project teams to determine the factors affecting construction delays and their influence to the overall project duration. 'Multiple Regression' techniques were used to quantify the influence of independent variables that contribute to overall delays in construction. ' | URI: | http://hdl.handle.net/10356/6607 | Research Centres: | Centre for Advanced Construction Studies | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_118.pdf Restricted Access | 8.43 MB | Adobe PDF | View/Open |
Page view(s) 50
604
Updated on May 7, 2025
Download(s)
14
Updated on May 7, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.