Title: Factors leading to delays in construction in infrastructure based projects
Authors: Tong, Tee Hui.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 2003
Abstract: The report describes an analysis programme conducted on road and infrastructure projects in Singapore. A survey was conducted on a sample of Project Management and Contract Administration individuals from various project teams to determine the factors affecting construction delays and their influence to the overall project duration. 'Multiple Regression' techniques were used to quantify the influence of independent variables that contribute to overall delays in construction. '
URI: http://hdl.handle.net/10356/6607
Research Centres: Centre for Advanced Construction Studies 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_118.pdf
  Restricted Access
8.43 MBAdobe PDFView/Open

Page view(s) 50

604
Updated on May 7, 2025

Download(s)

14
Updated on May 7, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.