Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6649
Title: Application of concurrent engineering in design-and-build projects
Authors: Fong, Yoke Cheong.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 1999
Abstract: In this dissertation, the author proposes a collaborative design environment to achieve concurrent engineering in design-and-build projects. This collaborative design environment supports: (1) different modes of design interaction in time (synchronous vs asynchronous), and space (collocated vs distributed); and (2) various needs of content sharing and exchange. The use of STEP methodology to store information in a common database, and in a neutral format, is also briefly discussed. The author also describes the use of design consistency manager in databases to automate the detection of design changes and modifications, as contrast to the laborious manual inspection of design drawings.
URI: http://hdl.handle.net/10356/6649
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_33.pdf
  Restricted Access
6.24 MBAdobe PDFView/Open

Page view(s) 20

383
checked on Sep 23, 2020

Download(s) 20

3
checked on Sep 23, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.