dc.description.abstractDiscusses the variations and disputes commonly encountered in public project claim management. Identify the shortcomings in public project contract management and seek the prevention method to avoid or overcome the shortcomings so as to minimize the variations, claim and dispute.en_US
dc.rightsNanyang Technological Universityen_US
dc.subjectDRNTU::Engineering::Civil engineering::Construction management
dc.titleConstruction claim management on public projectsen_US
dc.typeThesisen_US
dc.contributor.supervisorTan, Ee Pingen_US
dc.description.degreeMaster of Science (International Construction Management)en_US
dc.contributor.researchCentre for Advanced Construction Studiesen_US
dc.contributor.supervisor2Tiong, Lee Kongen_US
item.grantfulltextrestricted-
item.fulltextWith Fulltext-
Appears in Collections:CACS Theses
Files in This Item:
File Description SizeFormat 
CACS_THESES_45.pdf
  Restricted Access
2.95 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.