Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6675
Title: Success and pitfalls of the HDB design and build scheme
Authors: Liew, Shuik Chin.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 2001
Abstract: This dissertion attempts to provide an overview of the Design and Build scheme adoted by HDB and identify the rationale for implementing this arrangement. The whole process of the Design and Build scheme from tender to post contract will be elaborated.
URI: http://hdl.handle.net/10356/6675
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_57.pdf
  Restricted Access
5.17 MBAdobe PDFView/Open

Page view(s) 20

469
Updated on Apr 22, 2021

Download(s)

10
Updated on Apr 22, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.