Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6675
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLiew, Shuik Chin.en_US
dc.date.accessioned2008-09-17T11:50:41Z-
dc.date.available2008-09-17T11:50:41Z-
dc.date.copyright2001en_US
dc.date.issued2001-
dc.identifier.urihttp://hdl.handle.net/10356/6675-
dc.description.abstractThis dissertion attempts to provide an overview of the Design and Build scheme adoted by HDB and identify the rationale for implementing this arrangement. The whole process of the Design and Build scheme from tender to post contract will be elaborated.en_US
dc.rightsNanyang Technological Universityen_US
dc.subjectDRNTU::Engineering::Civil engineering::Construction management-
dc.titleSuccess and pitfalls of the HDB design and build schemeen_US
dc.typeThesisen_US
dc.contributor.supervisorLim, Ewe Chyeen_US
dc.description.degreeMaster of Science (International Construction Management)en_US
dc.contributor.researchCentre for Advanced Construction Studiesen_US
item.grantfulltextrestricted-
item.fulltextWith Fulltext-
Appears in Collections:CACS Theses
Files in This Item:
File Description SizeFormat 
CACS_THESES_57.pdf
  Restricted Access
5.17 MBAdobe PDFView/Open

Page view(s) 20

474
Updated on May 15, 2021

Download(s)

10
Updated on May 15, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.