Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6689
Title: From design to practice-some issues on design and construction techniques for cut and cover tunnels in D&B projects
Authors: Bolem Venkata Siva Rama Krishna Ravi Prasad
Keywords: DRNTU::Engineering::Civil engineering::Geotechnical
Issue Date: 2003
Abstract: In this study, various design and construction methods (case studies) proposed at the interfaces with existing and future developments with respect to temporary and permanent structures in the Cut an Cover Tunnels for the Kallang Paya Lebar Expressway (KPE) and Marina Line (MRT) Design and Build projects are reviewed.
URI: http://hdl.handle.net/10356/6689
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_7.pdf
  Restricted Access
11.45 MBAdobe PDFView/Open

Page view(s) 20

418
Updated on May 9, 2021

Download(s) 50

14
Updated on May 9, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.