Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6691
Full metadata record
DC FieldValueLanguage
dc.contributor.authorLi, Lynn Yingen_US
dc.contributor.authorRogel Ramos Rabinoen_US
dc.date.accessioned2008-09-17T11:51:04Z
dc.date.available2008-09-17T11:51:04Z
dc.date.copyright2003en_US
dc.date.issued2003
dc.identifier.urihttp://hdl.handle.net/10356/6691
dc.description.abstractThis dissertation covers the basis of BOT techniques and their potential advantages and disadvantages for the participants in these projects.en_US
dc.rightsNanyang Technological Universityen_US
dc.subjectDRNTU::Engineering::Civil engineering::Construction management
dc.titleA study of financing build-operate-transfer projectsen_US
dc.typeThesisen_US
dc.contributor.supervisorTiong, Robert Lee Kongen_US
dc.description.degreeMaster of Science (International Construction Management)en_US
dc.contributor.researchCentre for Advanced Construction Studiesen_US
item.fulltextWith Fulltext-
item.grantfulltextrestricted-
Appears in Collections:CACS Theses
Files in This Item:
File Description SizeFormat 
CACS_THESES_71.pdf
  Restricted Access
2.36 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.