Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6712
Title: Risk management in MRT-construction project using probabilistic risk analysis
Authors: Pakkrisamy Kalaichelvan
Arumugam Vijayanarayanan
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 2005
Abstract: The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabilistic risk methodology.
URI: http://hdl.handle.net/10356/6712
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_90.pdf
  Restricted Access
16.57 MBAdobe PDFView/Open

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.