Title: Contruction of underground subway for Outram Park Mass Rapid Transit station
Authors: Chinniah, Ravindran.
Keywords: DRNTU::Engineering::Civil engineering::Geotechnical
Issue Date: 2003
Abstract: The North East Line (NEL) of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The station excavation is 18m to 29m deep, and NEL tunnels are constructed approximately llm below the operational tunnels. Majority of the excavation is carried out in predominantly highly and moderately weathered sedimentary rocks of the Jurong Formation.
URI: http://hdl.handle.net/10356/6718
Research Centres: Centre for Advanced Construction Studies 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_96.pdf
  Restricted Access
7.96 MBAdobe PDFView/Open

Page view(s) 10

873
Updated on Mar 21, 2025

Download(s) 50

25
Updated on Mar 21, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.