Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6718
Title: | Contruction of underground subway for Outram Park Mass Rapid Transit station | Authors: | Chinniah, Ravindran. | Keywords: | DRNTU::Engineering::Civil engineering::Geotechnical | Issue Date: | 2003 | Abstract: | The North East Line (NEL) of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The station excavation is 18m to 29m deep, and NEL tunnels are constructed approximately llm below the operational tunnels. Majority of the excavation is carried out in predominantly highly and moderately weathered sedimentary rocks of the Jurong Formation. | URI: | http://hdl.handle.net/10356/6718 | Research Centres: | Centre for Advanced Construction Studies | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | CACS Theses |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
CACS_THESES_96.pdf Restricted Access | 7.96 MB | Adobe PDF | View/Open |
Page view(s) 10
873
Updated on Mar 21, 2025
Download(s) 50
25
Updated on Mar 21, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.