Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/6720
Title: Construction constraints within operational airport environment (case study - Changi airport MRT line & proposed T3 people mover system)
Authors: Sellappalany Perithamby.
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 2003
Abstract: Airport is a highly operational environment where many concurrent activities happen simultaneously. Due to changes in technology, aviation industry and passenger expectations, there is a constant need to upgrade and expand airport facilities. When construction works and aviation activities happen at the same time, disruptions to airport options are likely to happen. Some of these disruptions can cause miscommunications, which might eventually lead to serious accidents.
URI: http://hdl.handle.net/10356/6720
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CACS Theses

Files in This Item:
File Description SizeFormat 
CACS_THESES_98.pdf
  Restricted Access
4.16 MBAdobe PDFView/Open

Page view(s) 50

716
Updated on Dec 4, 2020

Download(s) 50

15
Updated on Dec 4, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.