Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/6810
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Yeo, Khim Teck. | en_US |
dc.date.accessioned | 2008-09-17T14:35:03Z | - |
dc.date.available | 2008-09-17T14:35:03Z | - |
dc.date.copyright | 1987 | en_US |
dc.date.issued | 1987 | - |
dc.identifier.uri | http://hdl.handle.net/10356/6810 | - |
dc.description.abstract | The purpose of this report is to present a framework for the definition, design and implementation of a microcomputer based project management and economic analysis model. | en_US |
dc.rights | Nanyang Technological University | en_US |
dc.subject | DRNTU::Engineering::Systems engineering | - |
dc.title | Development of an integrated project cost-time-resources simulation and economic evaluation system | en_US |
dc.type | Research Report | en_US |
dc.contributor.school | School of Mechanical and Production Engineering | en_US |
dc.description.reportnumber | RP 22184 | - |
item.fulltext | With Fulltext | - |
item.grantfulltext | restricted | - |
Appears in Collections: | MAE Research Reports (Staff & Graduate Students) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MPE-RESEARCH-REPORT_107.pdf Restricted Access | 723.43 kB | Adobe PDF | View/Open |
Page view(s) 20
698
Updated on Mar 26, 2024
Download(s)
4
Updated on Mar 26, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.