Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/68379
Title: Protection system analysis for power distribution system
Authors: Zaw, Hein Htet
Keywords: DRNTU::Engineering
Issue Date: 2016
Abstract: Protection System Analysis for Mesh Power Distribution System is important to achieve the reliability of the power distribution system and protection of the system equipment. Understanding on the relay coordination of the upstream and downstream electrical equipment plays an important role when discriminating the faults zones to protect the equipment. In this project, power transformers, switchgears, motors and protection devices will be analysed in order to get reliable power distribution system. Studied and investigated differential protection, overcurrent protection, line protection and earth fault protection during fault and the design project shall restore the electrical power after clear the fault by supplying from alternative source. Simulated and compared the results by using MATLAB software and analyse waveforms during fault and after cleared the fault.
URI: http://hdl.handle.net/10356/68379
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:EEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
FYP Final Report_Hein Htet Zaw_U1220187J.pdf
  Restricted Access
Protection System Analysis for Mesh Power Distribution System is important to achieve the reliability of the power distribution system and protection of the system equipment. Understanding on the relay coordination of the upstream and downstream electrical equipment plays an important role when discriminating the faults zones to protect the equipment. In this project, power transformers, switchgears, motors and protection devices will be analysed in order to get reliable power distribution system. Studied and investigated differential protection, overcurrent protection, line protection and earth fault protection during fault and the design project shall restore the electrical power after clear the fault by supplying from alternative source. Simulated and compared the results by using MATLAB software and analyse waveforms during fault and after cleared the fault.1.5 MBAdobe PDFView/Open

Page view(s)

124
Updated on May 7, 2021

Download(s) 50

20
Updated on May 7, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.