Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/71812
Title: Large-scale underground construction risk assessment using decision aids for tunneling (DAT)
Authors: Tan, Julia Chu Quan
Keywords: DRNTU::Engineering::Civil engineering::Construction management
Issue Date: 2017
Abstract: The Final Year Project (FYP) covers the need for risk analysis, types of risk particularly in construction projects, and further discusses on the use of the Decision Aids for Tunneling (DAT) for underground construction projects. It includes the review of basic underground construction methods, and goes further in depth to share the process of the DAT simulation. In this report, the risk analysis of an ongoing large scale underground project will be carried out via the DAT simulation. Steps wise procedure in the DAT simulation will be carefully explained in Chapter 3, and the results are then compared with the results from @Risk, a generic risk analysis program that has been used more commonly, but is unable to achieve a holistic risk analysis for large scale underground projects. Finally, after studying the risk analysis results from both DAT and @Risk, the potentials of DAT will be discussed.
URI: http://hdl.handle.net/10356/71812
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:CEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
Julia_Tan_CM11AB_FYP16-17_VR.pdf
  Restricted Access
2.76 MBAdobe PDFView/Open

Page view(s)

177
Updated on Jun 13, 2021

Download(s)

14
Updated on Jun 13, 2021

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.