Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/72975
Title: Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system
Authors: Chan, Wan Rong
Keywords: DRNTU::Engineering
Issue Date: 2017
Abstract: Presently, increasing productivity is essential in Singapore due to Singapore’s aging population and decrease of unskilled labour workers. Hence, the use of technology will facilitate in increasing productivity in the construction industry. One promising technology which can aid in improving productivity is the RFID technology, but it is not typically seen in the industry. The objective of this project is to analyse the feasibility in using RFID system for the construction processes and discuss if the utilization of RFID can improve the overall construction processes. A prototype is developed to show the feasibility of using the technology. The focus of the prototype is to show the feasibility of implementing RFID in the logistics management of precast concrete components. The benefits reaping from using the RFID is then discussed and is concluded that using RFID is not only beneficial to materials management but also for other construction processes such as during crane operation and overall project scheduling.
URI: http://hdl.handle.net/10356/72975
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:MAE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
Chan Wan Rong _ FYP Final Report.pdf
  Restricted Access
FYP Report2.24 MBAdobe PDFView/Open

Page view(s) 20

107
checked on Oct 19, 2020

Download(s) 20

20
checked on Oct 19, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.