Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/74551
Title: Deployment and test of micro-grid power park - part I
Authors: Tan, Jun Guo
Keywords: DRNTU::Engineering::Electrical and electronic engineering::Power electronics
Issue Date: 2018
Abstract: Renewable resources and micro-grids are resurfacing in-lieu of the increasing concerns in energy crises and global warming. The aim of this project was to assemble of hardware, calibration of sensors, design and test a control software that governs the operation and stability of a three-phase inverter so to allow the integration of DC resources onto a AC micro-grid environment. The experiment was carried out to obtain a three-phase sinusoidal output that worked according to the design. It was concluded that the assembly of hardware was successful, and the control model is effective in governing the operations and stability of a three-phase inverter. This end-product will serve as the base model for future site implementations
URI: http://hdl.handle.net/10356/74551
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:EEE Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
A1467-171 Final Report.pdf
  Restricted Access
2.91 MBAdobe PDFView/Open

Page view(s) 50

56
checked on Oct 21, 2020

Download(s) 50

4
checked on Oct 21, 2020

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.