Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/77723
Title: Analysis of a manufacturing system to improve performance using characteristics curve and modeling & simulation
Authors: Vivek, Suresh Babu
Keywords: DRNTU::Engineering::Manufacturing::Production management
Issue Date: 2019
Abstract: This project aimed to present an analysis for a semiconductor assembly and test manufacturing system. The objective of the final year report was to suggest improvements to enhance the performance of the factory for the NMPCC package. This was done by studying the characteristic curves for the manufacturing system and by experimenting with a simulation created on SIMUL8. Actual factory data was investigated; characteristic curves were plotted to illustrate the best-case, worst-case and practical worst-case scenarios. The current factory performance was plotted on the graph and found to be in the ‘bad’ region. The practical worst-case performance was calculated to be 7492.95 units/hr whereas the current performance was only 166.23 units/hr. The actual factory analysis also showed that the bottleneck occurred at station 1. A model was created for simulation using SIMUL8; it was then validated using actual factory values with a small difference of 3.47%. The simulation was used to find methods to enhance factory performance. The author found that additional machines at workstations would increase the throughput for the manufacturing system. The simulation also experimented with the statistical distribution of arrival for parts. The experiments demonstrated that varying parameters such as operating hours, machine efficiency and number of machines had effect on the overall factory performance. Finally, recommendations were made based from model experimentation results to improve factory performance. The author found that in order to increase the throughput value significantly, additional machines must be purchased. The main limitation for the project was the lack of data for the NMPCC package. All manual calculations for the NMPCC package were taken as estimates for the whole production line; this consisted of several packages. The author suggests that a more in-depth study can be performed if time permits and relevant data is sourced.
URI: http://hdl.handle.net/10356/77723
Schools: School of Mechanical and Aerospace Engineering 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:MAE Student Reports (FYP/IA/PA/PI)

Page view(s)

312
Updated on Jun 23, 2024

Download(s)

10
Updated on Jun 23, 2024

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.