Title: | Analysis of a manufacturing system to improve performance using characteristics curve and modeling & simulation | Authors: | Vivek, Suresh Babu | Keywords: | DRNTU::Engineering::Manufacturing::Production management | Issue Date: | 2019 | Abstract: | This project aimed to present an analysis for a semiconductor assembly and test manufacturing system. The objective of the final year report was to suggest improvements to enhance the performance of the factory for the NMPCC package. This was done by studying the characteristic curves for the manufacturing system and by experimenting with a simulation created on SIMUL8. Actual factory data was investigated; characteristic curves were plotted to illustrate the best-case, worst-case and practical worst-case scenarios. The current factory performance was plotted on the graph and found to be in the ‘bad’ region. The practical worst-case performance was calculated to be 7492.95 units/hr whereas the current performance was only 166.23 units/hr. The actual factory analysis also showed that the bottleneck occurred at station 1. A model was created for simulation using SIMUL8; it was then validated using actual factory values with a small difference of 3.47%. The simulation was used to find methods to enhance factory performance. The author found that additional machines at workstations would increase the throughput for the manufacturing system. The simulation also experimented with the statistical distribution of arrival for parts. The experiments demonstrated that varying parameters such as operating hours, machine efficiency and number of machines had effect on the overall factory performance. Finally, recommendations were made based from model experimentation results to improve factory performance. The author found that in order to increase the throughput value significantly, additional machines must be purchased. The main limitation for the project was the lack of data for the NMPCC package. All manual calculations for the NMPCC package were taken as estimates for the whole production line; this consisted of several packages. The author suggests that a more in-depth study can be performed if time permits and relevant data is sourced. | URI: | http://hdl.handle.net/10356/77723 | Schools: | School of Mechanical and Aerospace Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MAE Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B402 - ANALYSIS OF A MANUFACTURING SYSTEM TO IMPROVE PERFORMANCE USING CHARACTERISTICS CURVE AND MODELING & SIMULATION - SURESH BABU VIVEK PRABHU - N1804019B.pdf Restricted Access | FYP Report | 1.16 MB | Adobe PDF | View/Open |
Page view(s)
302
Updated on Mar 28, 2024
Download(s)
10
Updated on Mar 28, 2024
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.