Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/8044
Title: | Industrial attachment report with Pratt & Whitney Services Singapore Parts Repair Operations | Authors: | Tan, Siew Ann. | Keywords: | DRNTU::Engineering::Materials | Issue Date: | 2003 | Abstract: | The report gives an overview to the transformation in the production management method. It will show the reader of why the need to convert a presently productive operation to a higher level and how to implement a new system. | URI: | http://hdl.handle.net/10356/8044 | Schools: | School of Mechanical and Production Engineering | Rights: | Nanyang Technological University | Fulltext Permission: | restricted | Fulltext Availability: | With Fulltext |
Appears in Collections: | MSE Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MPE-REPORTS_24.pdf Restricted Access | 996.5 kB | Adobe PDF | View/Open |
Page view(s) 20
781
Updated on Mar 23, 2025
Download(s) 50
49
Updated on Mar 23, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.