Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/8044
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Tan, Siew Ann. | en_US |
dc.date.accessioned | 2008-09-19T01:55:33Z | - |
dc.date.available | 2008-09-19T01:55:33Z | - |
dc.date.copyright | 2003 | en_US |
dc.date.issued | 2003 | - |
dc.identifier.uri | http://hdl.handle.net/10356/8044 | - |
dc.description.abstract | The report gives an overview to the transformation in the production management method. It will show the reader of why the need to convert a presently productive operation to a higher level and how to implement a new system. | en_US |
dc.format.extent | 29 p. | - |
dc.rights | Nanyang Technological University | en_US |
dc.subject | DRNTU::Engineering::Materials | - |
dc.title | Industrial attachment report with Pratt & Whitney Services Singapore Parts Repair Operations | en_US |
dc.type | Industrial Attachment (IA) | en_US |
dc.contributor.supervisor | Butler, David Lee | en_US |
dc.contributor.school | School of Mechanical and Production Engineering | en_US |
item.fulltext | With Fulltext | - |
item.grantfulltext | restricted | - |
Appears in Collections: | MSE Student Reports (FYP/IA/PA/PI) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
MPE-REPORTS_24.pdf Restricted Access | 996.5 kB | Adobe PDF | View/Open |
Page view(s) 50
782
Updated on Apr 18, 2025
Download(s) 50
49
Updated on Apr 18, 2025
Google ScholarTM
Check
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.