Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/8394
Title: Solving of the economic lot scheduling problem using a power of two based policy
Authors: Dhivya Chandrasekaran
Keywords: DRNTU::Business::Operations management::Business planning
Issue Date: 2002
Abstract: In this project, we propose an algorithm that starts with the Common Cycle time solution which guarantees feasibility to the schedule generated and then improve upon this solution to minimize the cost of production. The power of two based heuristic policy is used to improve the Common Cycle Time solution.
URI: http://hdl.handle.net/10356/8394
Schools: Nanyang Business School 
Rights: Nanyang Technological University
Fulltext Permission: restricted
Fulltext Availability: With Fulltext
Appears in Collections:NBS Student Reports (FYP/IA/PA/PI)

Files in This Item:
File Description SizeFormat 
NBS-REPORTS_1155.pdf
  Restricted Access
289.78 kBAdobe PDFView/Open

Page view(s) 50

570
Updated on Mar 21, 2025

Download(s)

3
Updated on Mar 21, 2025

Google ScholarTM

Check

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.