Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/84586
Title: | Determination of earth pressure balance tunnel-related maximum surface settlement: a multivariate adaptive regression splines approach | Authors: | Goh, Anthony Teck Chee Zhang, Wengang Zhang, Yanmei Xiao, Yang Xiang, Yuzhou |
Keywords: | Surface settlement EPB shield |
Issue Date: | 2016 | Source: | Goh, A. T. C., Zhang, W., Zhang, Y., Xiao, Y., & Xiang, Y. (2016). Determination of earth pressure balance tunnel-related maximum surface settlement: a multivariate adaptive regression splines approach. Bulletin of Engineering Geology and the Environment, in press. | Series/Report no.: | Bulletin of Engineering Geology and the Environment | Abstract: | A major consideration in urban tunnel design is to estimate the ground movements and surface settlements associated with the tunnelling operations. Excessive ground movements may result in damage to adjacent buildings and utilities. Numerous empirical and analytical solutions have been proposed to relate the shield tunnel characteristics and surface/subsurface deformation. Numerical analyses, either 2D or 3D, have also been applied to such tunnelling problems. However, substantially fewer approaches have been developed for earth pressure balance (EPB) tunnelling. Based on instrumented data on ground deformation and shield operation from three separate EPB tunnelling projects in Singapore, this paper utilizes a multivariate adaptive regression splines (MARS) approach to establish relationships between the maximum surface settlement and the major influencing factors, including the operation parameters, the cover depth and the ground conditions. Since the method has the ability to map input to output patterns, MARS enables one to map all influencing parameters to surface settlements. The main advantages of MARS over other soft computing techniques such as ANN, RVM, SVM and GP are its capacity to produce a simple, easy-to-interpret model, its ability to estimate the contributions of the input variables, and its computational efficiency. | URI: | https://hdl.handle.net/10356/84586 http://hdl.handle.net/10220/41886 |
ISSN: | 1435-9529 | DOI: | 10.1007/s10064-016-0937-8 | Schools: | School of Civil and Environmental Engineering School of Mechanical and Aerospace Engineering |
Rights: | © 2016 Springer-Verlag Berlin Heidelberg. This is the author created version of a work that has been peer reviewed and accepted for publication by Bulletin of Engineering Geology and the Environment, Springer Berlin Heidelberg. It incorporates referee’s comments but changes resulting from the publishing process, such as copyediting, structural formatting, may not be reflected in this document. The published version is available at: [http://dx.doi.org/10.1007/s10064-016-0937-8]. | Fulltext Permission: | open | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Journal Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Determination of earth pressure balance tunnel-related maximum surface settlement.pdf | 1.31 MB | Adobe PDF | ![]() View/Open |
SCOPUSTM
Citations
5
163
Updated on Mar 9, 2025
Web of ScienceTM
Citations
5
115
Updated on Oct 26, 2023
Page view(s) 10
874
Updated on Mar 22, 2025
Download(s) 5
592
Updated on Mar 22, 2025
Google ScholarTM
Check
Altmetric
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.