Please use this identifier to cite or link to this item:
https://hdl.handle.net/10356/88682
Title: | Optimal scheduling of a microgrid including pump scheduling and network constraints | Authors: | Krishnan, Ashok Sampath, Lahanda Purage Mohasha Isuru Foo, Eddy Yi Shyh Gooi, Hoay Beng |
Keywords: | DRNTU::Engineering::Electrical and electronic engineering Network Constraints Scheduling |
Issue Date: | 2018 | Source: | Krishnan, A., Sampath, L. P. M. I., Foo, E. Y. S., & Gooi, H. B. (2018). Optimal Scheduling of a Microgrid Including Pump Scheduling and Network Constraints. Complexity, 2018, 9842025-. doi:10.1155/2018/9842025 | Series/Report no.: | Complexity | Abstract: | This paper proposes an efficient energy management system (EMS) for industrial microgrids (MGs). Many industries deploy large pumps for their processes. Oftentimes, such pumps are operated during hours of peak electricity prices. A lot of industries use a mix of captive generation and imported utility electricity to meet their energy requirements. The MG considered in this paper includes diesel generators, battery energy storage systems, renewable energy sources, flexible loads, and interruptible loads. Pump loads found in shipyard dry docks are modelled as exemplar flexible industrial loads. The proposed EMS has a two-stage architecture. An optimal MG scheduling problem including pump scheduling and curtailment of interruptible loads (ILs) is formulated and solved in the first stage. An optimal power flow problem is solved in the second stage to verify the feasibility of the MG schedule with the network constraints. An iterative procedure is used to coordinate the two EMS stages. Multiple case studies are used to demonstrate the utility of the proposed EMS. The case studies highlight the efficacy of load management strategies such as pump scheduling and curtailment of ILs in reducing the total electricity cost of the MG. | URI: | https://hdl.handle.net/10356/88682 http://hdl.handle.net/10220/45856 |
ISSN: | 1076-2787 | DOI: | 10.1155/2018/9842025 | Schools: | School of Electrical and Electronic Engineering Interdisciplinary Graduate School (IGS) |
Rights: | © 2018 Ashok Krishnan et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. | Fulltext Permission: | open | Fulltext Availability: | With Fulltext |
Appears in Collections: | EEE Journal Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Optimal Scheduling of a Microgrid Including Pump Scheduling and Network Constraints.pdf | 903.49 kB | Adobe PDF | ![]() View/Open |
SCOPUSTM
Citations
50
4
Updated on Mar 14, 2025
Web of ScienceTM
Citations
50
3
Updated on Oct 24, 2023
Page view(s)
412
Updated on Mar 23, 2025
Download(s) 50
99
Updated on Mar 23, 2025
Google ScholarTM
Check
Altmetric
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.