Please use this identifier to cite or link to this item: https://hdl.handle.net/10356/94397
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDing, Yien
dc.contributor.authorWang, Pengen
dc.contributor.authorGoel, Laliten
dc.contributor.authorChen, Luonanen
dc.contributor.authorLoh, Poh Chiangen
dc.date.accessioned2011-10-10T01:34:49Zen
dc.date.accessioned2019-12-06T18:55:23Z-
dc.date.available2011-10-10T01:34:49Zen
dc.date.available2019-12-06T18:55:23Z-
dc.date.copyright2010en
dc.date.issued2010en
dc.identifier.citationDing, Y., Wang, P., Lalit, G., Chen, L., & Loh, P. C. (2010). A penalty scheme for reducing electricity price volatility. IEEE Transactions on Power Systems, 25(1), 223-233.en
dc.identifier.issn0885-8950en
dc.identifier.urihttps://hdl.handle.net/10356/94397-
dc.description.abstractThe deregulation of electric power systems in many parts of the world has changed the mechanism of electricity pricing. Unlike the fixed price in conventional power systems, electricity price varies with time and location in the new deregulated environment. Electricity prices in a restructured power system can be highly volatile due to the random nature of system failures and demands. It is therefore very difficult for the independent system operator (ISO) to control the price and associated risk. The high prices beyond control have resulted in significant impacts on customers as well as on system operation. This paper proposes a penalty scheme for reducing electricity price volatility caused by failures in generation companies (Gencos) or transmission companies (Transcos). In this scheme, Gencos and Transcos will be penalized if their equipment failures result in unexpected price changes. The price decomposition technique is used to evaluate the price components caused by random failures. The penalty can be calculated based on the difference of electricity price components between the normal state and the contingency states. Moreover, a simplified schema which is based on profit analysis is also proposed in this paper. The proposed penalty scheme not only gives the Gencos and Transcos an incentive to improve their reliabilities but also provides a flexible tool for the ISO to control the system price risk. The possible shortcomings of the proposed schema are also specified in the paper. The IEEE RTS is analyzed to illustrate the technique.en
dc.format.extent10 p.en
dc.language.isoenen
dc.relation.ispartofseriesIEEE transactions on power systemsen
dc.rights© 2010 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works. The published version is available at: 10.1109/TPWRS.2009.2032323.en
dc.subjectDRNTU::Engineering::Electrical and electronic engineering::Electric power::Production, transmission and distributionen
dc.titleA penalty scheme for reducing electricity price volatilityen
dc.typeJournal Articleen
dc.contributor.schoolSchool of Electrical and Electronic Engineeringen
dc.identifier.doi10.1109/TPWRS.2009.2032323en
dc.description.versionAccepted versionen
item.grantfulltextnone-
item.fulltextNo Fulltext-
Appears in Collections:EEE Journal Articles

SCOPUSTM   
Citations 20

9
Updated on May 25, 2023

Web of ScienceTM
Citations 20

7
Updated on May 30, 2023

Page view(s) 5

884
Updated on Jun 4, 2023

Google ScholarTM

Check

Altmetric


Plumx

Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.