Title: | An application of master schedule smoothing and planned lead time control | Authors: | Graves, Stephen C. Teo, Chee-Chong Bhatnagar, Rohit |
Keywords: | Production Smoothing Oil-rig Building DRNTU::Engineering::Civil engineering |
Issue Date: | 2012 | Source: | Teo, C.-C., Bhatnagar, R., & Graves, S. C. (2012). An application of master schedule smoothing and planned lead time control. Production and Operations Management, 21(2), 211-223. doi:10.1111/j.1937-5956.2011.01263.x | Series/Report no.: | Production and Operations Management | Abstract: | Make-to-order (MTO) manufacturers must ensure concurrent availability of all parts required for production, as any unavailability may cause a delay in completion time. A major challenge for MTO manufacturers operating under high demand variability is to produce customized parts in time to meet internal production schedules. We present a case study of a producer of MTO offshore oil rigs that highlights the key aspects of the problem. The producer was faced with an increase in both demand and demand variability. Consequently, it had to rely heavily on subcontracting to handle production requirements that were in excess of its capacity. We focused on the manufacture of customized steel panels, which represent the main sub-assemblies for building an oil rig. We considered two key tactical parameters: the planning window of the master production schedule and the planned lead time of each workstation. Under the constraint of a fixed internal delivery lead time, we determined the optimal planning parameters. This improvement effort reduced the subcontracting cost by implementing several actions: the creation of a master schedule for each sub-assembly family of the steel panels, the smoothing of the master schedule over its planning window, and the controlling of production at each workstation by its planned lead time. We report our experience in applying the analytical model, the managerial insights gained, and how the application benefits the oil-rig producer. | URI: | https://hdl.handle.net/10356/98150 http://hdl.handle.net/10220/12323 |
ISSN: | 1059-1478 | DOI: | 10.1111/j.1937-5956.2011.01263.x | Schools: | Nanyang Business School School of Civil and Environmental Engineering |
Research Centres: | Singapore-MIT Alliance Programme | Rights: | © 2012 John Wiley & Sons, Inc. All rights reserved. This paper was published in Production and Operations Management and is made available with permission of John Wiley & Sons, Inc. | Fulltext Permission: | open | Fulltext Availability: | With Fulltext |
Appears in Collections: | CEE Journal Articles NBS Journal Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
An application of master schedule smoothing and planned lead times control.pdf | 441.56 kB | Adobe PDF | ![]() View/Open |
SCOPUSTM
Citations
20
18
Updated on Mar 13, 2025
Web of ScienceTM
Citations
20
16
Updated on Oct 24, 2023
Page view(s) 10
992
Updated on Mar 16, 2025
Download(s) 50
213
Updated on Mar 16, 2025
Google ScholarTM
Check
Altmetric
Items in DR-NTU are protected by copyright, with all rights reserved, unless otherwise indicated.