<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T21:16:47Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/19928" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/19928</identifier><datestamp>2025-04-30T22:32:11Z</datestamp><setSpec>com_10356_986</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2218</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Chee, Tong Seng.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en_US" authority="a3f00e0c-49f5-4bb6-a408-66ee7120b40a" confidence="600">School of Mechanical and Production Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2009-12-14T07:51:43Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2009-12-14T07:51:43Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">1997</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">1997</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/10356/19928</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">This research develops a process-based risk management framework for sponsors of BOT (Build-Operate-Transfer) power projects. The essence of this research is that risk management should be proactive in nature and focus on during project promotion. The framework comprises the three activities which the sponsor undergoes concurrently in order to effectively manage project risks: (i) Structuring Management Responses; (ii) Risk Modeling and Analysis; and (iii) Pre-Project Planning.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Engineering (MPE)</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">146 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">NANYANG TECHNOLOGICAL UNIVERSITY</dim:field>
   <dim:field mdschema="dc" element="subject">DRNTU::Engineering::Industrial engineering::Project management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Risk management of Build-Operate-Transfer (B.O.T.) power projects : a framework for project sponsors</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="93a753a7-dc72-422d-8d65-26ee5f556a19">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Risk management of Build-Operate-Transfer (B.O.T.) power projects : a framework for project sponsors&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>1997&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Chee, Tong Seng.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Industrial engineering::Project management&lt;/Keyword>
   	&lt;Abstract>This research develops a process-based risk management framework for sponsors of BOT (Build-Operate-Transfer) power projects. The essence of this research is that risk management should be proactive in nature and focus on during project promotion. The framework comprises the three activities which the sponsor undergoes concurrently in order to effectively manage project risks: (i) Structuring Management Responses; (ii) Risk Modeling and Analysis; and (iii) Pre-Project Planning.&lt;/Abstract>