<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T18:40:26Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/201145" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/201145</identifier><datestamp>2026-11-27T18:02:25Z</datestamp><setSpec>com_10356_982</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2152</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author">Lin, Penghui</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor">Tiong Lee Kong, Robert</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" authority="a6dec9ca-977d-49d3-af9e-2924bad6cbb7" confidence="600">School of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisoremail">CLKTIONG@ntu.edu.sg</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2025-07-15T08:36:06Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2025-07-15T08:36:06Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2025</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri" lang="en">https://hdl.handle.net/10356/201145</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="doi">10.32657/10356/201145</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract">The rapid pace of urbanization and population growth has accelerated the demand for underground tunnelling. With the advent of digitalization and big data, the tunnelling industry is undergoing substantial transformation, increasingly relying on collaborative technological approaches to meet the need for interdependent, tightly regulated, and &amp;quot;intelligent&amp;quot; design solutions. In confined underground environments, tunnelling operations must be optimized to ensure safety, cost-effectiveness, and minimal disruption to existing subsurface and surface infrastructure. The extensive data generated by contemporary tunnel boring machines (TBMs) presents a significant opportunity for the application of machine learning (ML) to enhance decision-making through timely and relevant insights. However, the use of ML in tunnel construction is hindered by several challenges: (1) Limited historical data on tunnel-induced damages, particularly settlement-related data, (2) Complex and uncertain geological conditions, and (3) The inherent &amp;quot;black-box&amp;quot; nature of ML models, which often lack interpretability in engineering contexts. In response to these limitations, this research aims to develop a series of physics-informed machine learning (PIML) methods to enhance safety control in tunnelling projects.
This study explores the application of PIML in tunnelling safety enhancement through four main stages: (1) Evaluation of system reliability with stochastic simulation, (2) Optimization of underground safety with fuzzy-robust programming, (3) Control of operational parameters with deep learning networks, and (4) Generation of operational strategy with reinforcement learning. The key findings are summarized as follows: (1) The stochastic simulation approach facilitates reliable system evaluation in large-diameter tunnelling projects, effectively addressing geological uncertainties and modeling errors; (2) Fuzzy-robust optimization significantly enhances structural safety, where robustness addresses unavoidable uncertainties in geotechnical conditions by adopting conservative solutions, while fuzzy logic seeks optimal solutions by balancing objectives and constraints; (3) PIML methods significantly improve the interpretability of relationships between variables, enhancing model reliability and predictive accuracy, particularly in multi-step forecasting with limited datasets; (4) Integrating physics-based insights into reinforcement learning enhances TBM operation efficiency, offering transformative potential for automated, reliable, and efficient tunnel construction.
Additionally, techniques such as explainable artificial intelligence (XAI), generative design, and parametric design are integrated to improve model performance. XAI techniques validate the rationality of PIML models, while generative design enables engineers to understand and control the optimization process, thereby fostering greater adoption of ML methods in tunnelling. In summary, the proposed PIML-based safety enhancement methodologies substantially improve the reliability and efficiency of tunnelling projects, advancing the automation, control, and intelligent decision-making in tunnel construction to new levels.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree">Doctor of Philosophy</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en</dim:field>
   <dim:field mdschema="dc" element="publisher">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="rights">This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License (CC BY-NC 4.0).</dim:field>
   <dim:field mdschema="dc" element="subject">Engineering</dim:field>
   <dim:field mdschema="dc" element="title">Physics-informed machine learning for enhancing safety in tunnelling projects</dim:field>
   <dim:field mdschema="dc" element="type">Thesis-Doctor of Philosophy</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="scopus">2026-11-25T21:23:24Z</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="wos">2025-08-13T00:15:44Z</dim:field>
   <dim:field mdschema="datacite" element="rights">embargo</dim:field>
   <dim:field mdschema="datacite" element="available">2027-07-16</dim:field>embargoembargo<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="2b4911c8-8fac-4e22-b354-c01c580a1753">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Physics-informed machine learning for enhancing safety in tunnelling projects&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2025&lt;/PublicationDate>
   	&lt;DOI>10.32657/10356/201145&lt;/DOI>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Lin, Penghui&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Nanyang Technological University&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>Engineering&lt;/Keyword>
   	&lt;Abstract>The rapid pace of urbanization and population growth has accelerated the demand for underground tunnelling. With the advent of digitalization and big data, the tunnelling industry is undergoing substantial transformation, increasingly relying on collaborative technological approaches to meet the need for interdependent, tightly regulated, and &amp;quot;intelligent&amp;quot; design solutions. In confined underground environments, tunnelling operations must be optimized to ensure safety, cost-effectiveness, and minimal disruption to existing subsurface and surface infrastructure. The extensive data generated by contemporary tunnel boring machines (TBMs) presents a significant opportunity for the application of machine learning (ML) to enhance decision-making through timely and relevant insights. However, the use of ML in tunnel construction is hindered by several challenges: (1) Limited historical data on tunnel-induced damages, particularly settlement-related data, (2) Complex and uncertain geological conditions, and (3) The inherent &amp;quot;black-box&amp;quot; nature of ML models, which often lack interpretability in engineering contexts. In response to these limitations, this research aims to develop a series of physics-informed machine learning (PIML) methods to enhance safety control in tunnelling projects.
This study explores the application of PIML in tunnelling safety enhancement through four main stages: (1) Evaluation of system reliability with stochastic simulation, (2) Optimization of underground safety with fuzzy-robust programming, (3) Control of operational parameters with deep learning networks, and (4) Generation of operational strategy with reinforcement learning. The key findings are summarized as follows: (1) The stochastic simulation approach facilitates reliable system evaluation in large-diameter tunnelling projects, effectively addressing geological uncertainties and modeling errors; (2) Fuzzy-robust optimization significantly enhances structural safety, where robustness addresses unavoidable uncertainties in geotechnical conditions by adopting conservative solutions, while fuzzy logic seeks optimal solutions by balancing objectives and constraints; (3) PIML methods significantly improve the interpretability of relationships between variables, enhancing model reliability and predictive accuracy, particularly in multi-step forecasting with limited datasets; (4) Integrating physics-based insights into reinforcement learning enhances TBM operation efficiency, offering transformative potential for automated, reliable, and efficient tunnel construction.
Additionally, techniques such as explainable artificial intelligence (XAI), generative design, and parametric design are integrated to improve model performance. XAI techniques validate the rationality of PIML models, while generative design enables engineers to understand and control the optimization process, thereby fostering greater adoption of ML methods in tunnelling. In summary, the proposed PIML-based safety enhancement methodologies substantially improve the reliability and efficiency of tunnelling projects, advancing the automation, control, and intelligent decision-making in tunnel construction to new levels.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>