<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T18:36:21Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/201258" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/201258</identifier><datestamp>2025-07-22T12:13:22Z</datestamp><setSpec>com_10356_986</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2218</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author">Cao, Man</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor">Felix Lena Stephanie</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" authority="50c1ae5d-dbc2-4261-8647-8a6bc78fd13d" confidence="600">School of Mechanical and Aerospace Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisoremail">lsfelix@ntu.edu.sg</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2025-07-21T01:43:54Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2025-07-21T01:43:54Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2025</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/10356/201258</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract">This study revolves around the risk management of large-scale construction projects in Singapore. The study mainly aims to identify and prioritize critical risk factors such as schedule risks, design risks, safety risks, and financial risks. It will also evaluate the impact of these risks and investigate the application of common risk management tools currently used in large-scale Singapore construction projects. This is achieved through online and physical questionnaires and interviews with employees from 11 large construction contractors that handle construction projects with contract values exceeding S$20 million dollars in Singapore. Based on the results obtained, the information was filtered, analyzed, and compared against the literature review and research hypotheses. The study provides valuable insights into the critical risks, their impacts on different project phases, and reveals the popular risk management tools utilized in large-scale construction projects in Singapore.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree">Master's degree</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en</dim:field>
   <dim:field mdschema="dc" element="publisher">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject">Engineering</dim:field>
   <dim:field mdschema="dc" element="subject" qualifier="keywords">Risk management</dim:field>
   <dim:field mdschema="dc" element="subject" qualifier="keywords">Construction</dim:field>
   <dim:field mdschema="dc" element="title">Project risk management in large-scale construction projects</dim:field>
   <dim:field mdschema="dc" element="type">Thesis-Master by Coursework</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="a6ba382c-bda8-45b0-94db-0be98a5bc189">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Project risk management in large-scale construction projects&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2025&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Cao, Man&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;DisplayName>Nanyang Technological University&lt;/DisplayName>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>Engineering&lt;/Keyword>
   	&lt;Abstract>This study revolves around the risk management of large-scale construction projects in Singapore. The study mainly aims to identify and prioritize critical risk factors such as schedule risks, design risks, safety risks, and financial risks. It will also evaluate the impact of these risks and investigate the application of common risk management tools currently used in large-scale Singapore construction projects. This is achieved through online and physical questionnaires and interviews with employees from 11 large construction contractors that handle construction projects with contract values exceeding S$20 million dollars in Singapore. Based on the results obtained, the information was filtered, analyzed, and compared against the literature review and research hypotheses. The study provides valuable insights into the critical risks, their impacts on different project phases, and reveals the popular risk management tools utilized in large-scale construction projects in Singapore.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>