<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-27T11:13:33Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/20587" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/20587</identifier><datestamp>2025-05-14T20:46:13Z</datestamp><setSpec>com_10356_2272</setSpec><setSpec>com_10356_2129</setSpec><setSpec>col_10356_2273</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Tan, Chak Huah.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en_US">Ho, Nai Choon</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="research" lang="en_US" authority="483a4add-0c05-412c-8e93-050f8434548d" confidence="600">Gintic Institute of Manufacturing Technology</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2009-12-15T03:26:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2009-12-15T03:26:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">1993</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">1993</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/10356/20587</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">A Manufacturing Resource Planning System (MRP II) integrates long-term business strategies and short-term tactical plans. It plans and releases manufacturing orders to the shop floor while making sure that resources and all required materials, which includes manufactured and purchased parts, are available to fulfill finished production schedules and meet product deliveries deadlines. The inventory control and planning aspects of an MRP II system are fairly standardised and well understood. However, since most MRP II software packages are designed for general manufacturing environments, the capacity planning function is too general to be of effective use in each unique shop floor that exists in different companies.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">​Master of Science (Computer Integrated Manufacturing)</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent">111 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso">en</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">NANYANG TECHNOLOGICAL UNIVERSITY</dim:field>
   <dim:field mdschema="dc" element="subject">DRNTU::Engineering::Manufacturing::Production management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Integrating operations scheduling and control within a CIM environment</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="6a15394c-a756-4038-b1c2-3799515f77d9">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Integrating operations scheduling and control within a CIM environment&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>1993&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Tan, Chak Huah.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Manufacturing::Production management&lt;/Keyword>
   	&lt;Abstract>A Manufacturing Resource Planning System (MRP II) integrates long-term business strategies and short-term tactical plans. It plans and releases manufacturing orders to the shop floor while making sure that resources and all required materials, which includes manufactured and purchased parts, are available to fulfill finished production schedules and meet product deliveries deadlines. The inventory control and planning aspects of an MRP II system are fairly standardised and well understood. However, since most MRP II software packages are designed for general manufacturing environments, the capacity planning function is too general to be of effective use in each unique shop floor that exists in different companies.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>