<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T23:07:14Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/41539" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/41539</identifier><datestamp>2025-05-14T18:08:39Z</datestamp><setSpec>com_10356_983</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2142</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author">Tan, Hock Soon.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en_US" authority="fcd133af-ad04-4af2-985f-82c3976e0c14" confidence="600">School of Computer Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor2" lang="en_US">Robert De Souza</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2010-07-20T04:11:12Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2010-07-20T04:11:12Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">1995</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">1995</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/10356/41539</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">In recent years, many firms have rediscovered the importance of scheduling in the shop&#xd;
&#xd;
floor. Within the manufacturing functions, scheduling remains among the most&#xd;
&#xd;
important and challenging tasks that must be performed routinely. Developing a&#xd;
&#xd;
schedule involves designating the resources needed to execute each operation of the&#xd;
&#xd;
process routing plan and assigning the times at which each operation in the routing will&#xd;
&#xd;
start and finish execution. It is apparent that three common scheduling approaches:&#xd;
&#xd;
OR-based, Simulation-based and Al-based alone cannot fully solve the scheduling&#xd;
&#xd;
problem satisfactorily. The trend is towards a combination of the three approaches. A&#xd;
&#xd;
hybrid approach using a neural network and simulation-based scheduling to solve the&#xd;
&#xd;
detailed scheduling problem of the shop floor is presented. The neural network is&#xd;
&#xd;
developed to analyze the complex information as well as orders coming into the&#xd;
&#xd;
shopfloor and suggests candidate scheduling rules to the simulation model. The&#xd;
&#xd;
simulation model then uses the rules to schedule the orders on hand. The scheduling&#xd;
&#xd;
performance is analyzed, and strengths and limitations of the approach are discussed.&#xd;
&#xd;
The work is set against a backdrop of a currently operating flexible manufacturing cell.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Science</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">156 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">en</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">DRNTU::Engineering::Systems engineering</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Development of an intelligent shopfloor scheduler using neural networks and simulation</dim:field>
   <dim:field mdschema="dc" element="type">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="3d93b4f6-2664-4828-8391-ea095d8af2bf">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Development of an intelligent shopfloor scheduler using neural networks and simulation&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>1995&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Tan, Hock Soon.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Systems engineering&lt;/Keyword>
   	&lt;Abstract>In recent years, many firms have rediscovered the importance of scheduling in the shop&#xd;
&#xd;
floor. Within the manufacturing functions, scheduling remains among the most&#xd;
&#xd;
important and challenging tasks that must be performed routinely. Developing a&#xd;
&#xd;
schedule involves designating the resources needed to execute each operation of the&#xd;
&#xd;
process routing plan and assigning the times at which each operation in the routing will&#xd;
&#xd;
start and finish execution. It is apparent that three common scheduling approaches:&#xd;
&#xd;
OR-based, Simulation-based and Al-based alone cannot fully solve the scheduling&#xd;
&#xd;
problem satisfactorily. The trend is towards a combination of the three approaches. A&#xd;
&#xd;
hybrid approach using a neural network and simulation-based scheduling to solve the&#xd;
&#xd;
detailed scheduling problem of the shop floor is presented. The neural network is&#xd;
&#xd;
developed to analyze the complex information as well as orders coming into the&#xd;
&#xd;
shopfloor and suggests candidate scheduling rules to the simulation model. The&#xd;
&#xd;
simulation model then uses the rules to schedule the orders on hand. The scheduling&#xd;
&#xd;
performance is analyzed, and strengths and limitations of the approach are discussed.&#xd;
&#xd;
The work is set against a backdrop of a currently operating flexible manufacturing cell.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>