<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-29T01:38:26Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/41557" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/41557</identifier><datestamp>2025-05-01T01:10:51Z</datestamp><setSpec>com_10356_986</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2218</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author">Tan, Choon Siang.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en_US" authority="a3f00e0c-49f5-4bb6-a408-66ee7120b40a" confidence="600">School of Mechanical and Production Engineering</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor2" lang="en_US">Chua Tay Jin</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2010-07-20T08:44:59Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2010-07-20T08:44:59Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">1996</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">1996</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/10356/41557</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">Schedule-based Manufacturing (SBM) is a paradigmatic shift in Manufacturing Planning&#xd;
&#xd;
and Control (MPC). It is a migration from the MRPII methodology. The approach of MRPII is largely procedural and is basically top-down, however SBM aims to adopt an integrated and responsive methodology capable of meeting the ever changing and&#xd;
&#xd;
increasing competition in market demand. Unlike MRPII, SBM merges the vertical&#xd;
&#xd;
separation of Master Schedule (MS) and Production Schedule (PS) by directly&#xd;
&#xd;
transforming master orders to scheduled works orders. It effectively resolves the&#xd;
&#xd;
differences between Material Requirements Planning (MRP) and Capacity Requirement&#xd;
&#xd;
Planning (CRP) by using the Bill of Manufacture (BOMF) instead of Bill of Materials (BOM). SBM is in fact an integrater of production planning and scheduling, it can provide an integrated solution to materials and resources for manufacturers [2].</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Science</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en_US">112 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en_US">en</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en_US">DRNTU::Engineering::Industrial engineering::Managerial control systems</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Designing and comparing schedule-based manufacturing with MRPII</dim:field>
   <dim:field mdschema="dc" element="type">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="b9d16af5-c286-4d73-86d6-643cc38d1096">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Designing and comparing schedule-based manufacturing with MRPII&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>1996&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Tan, Choon Siang.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Industrial engineering::Managerial control systems&lt;/Keyword>
   	&lt;Abstract>Schedule-based Manufacturing (SBM) is a paradigmatic shift in Manufacturing Planning&#xd;
&#xd;
and Control (MPC). It is a migration from the MRPII methodology. The approach of MRPII is largely procedural and is basically top-down, however SBM aims to adopt an integrated and responsive methodology capable of meeting the ever changing and&#xd;
&#xd;
increasing competition in market demand. Unlike MRPII, SBM merges the vertical&#xd;
&#xd;
separation of Master Schedule (MS) and Production Schedule (PS) by directly&#xd;
&#xd;
transforming master orders to scheduled works orders. It effectively resolves the&#xd;
&#xd;
differences between Material Requirements Planning (MRP) and Capacity Requirement&#xd;
&#xd;
Planning (CRP) by using the Bill of Manufacture (BOMF) instead of Bill of Materials (BOM). SBM is in fact an integrater of production planning and scheduling, it can provide an integrated solution to materials and resources for manufacturers [2].&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>