<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-29T09:23:32Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/46732" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/46732</identifier><datestamp>2026-11-21T20:38:51Z</datestamp><setSpec>com_10356_982</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2152</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en">Weng, Haijie</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en">Chen Po-Han</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en" authority="a6dec9ca-977d-49d3-af9e-2924bad6cbb7" confidence="600">School of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned" lang="en">2011-12-23T07:25:25Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available" lang="en">2011-12-23T07:25:25Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en">2005</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en">2005</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="citation" lang="en">Weng, H. (2005). A two-phase GA model for resource-contrained project scheduling. Master’s thesis, Nanyang Technological University, Singapore.</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri" lang="en">https://hdl.handle.net/10356/46732</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="doi" lang="en">10.32657/10356/46732</dim:field>
   <dim:field mdschema="dc" element="description" lang="en">159 p.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en">Project scheduling has a tremendous effect on the performance of a construction project. In project scheduling, problems can arise when each activity can be started at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource demands, etc. To resolve these problems, a two-phase GA (genetic algorithms) model was proposed in this research, in which both the effects of time-cost trade-off and resource scheduling were taken into account. A GA-based time-cost trade-off analysis was adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en">MASTER OF ENGINEERING (CEE)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">DRNTU::Engineering::Civil engineering::Construction management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en">A two-phase GA model for resource-contrained project scheduling</dim:field>
   <dim:field mdschema="dc" element="type" lang="en">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="scopus">2026-11-21T20:38:50Z</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="wos">2025-08-12T00:29:53Z</dim:field>
   <dim:field mdschema="datacite" element="rights">open.access</dim:field>open.accessopen.access<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="e6d4fd6a-4ac7-49c1-8e14-d5c6db140ce0">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>A two-phase GA model for resource-contrained project scheduling&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2005&lt;/PublicationDate>
   	&lt;DOI>10.32657/10356/46732&lt;/DOI>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Weng, Haijie&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Civil engineering::Construction management&lt;/Keyword>
   	&lt;Abstract>Project scheduling has a tremendous effect on the performance of a construction project. In project scheduling, problems can arise when each activity can be started at different time points and the resources needed by the activities are limited. Moreover, activities have required conditions to be met, such as precedence relationships, resource demands, etc. To resolve these problems, a two-phase GA (genetic algorithms) model was proposed in this research, in which both the effects of time-cost trade-off and resource scheduling were taken into account. A GA-based time-cost trade-off analysis was adopted to select the execution mode of each activity through the balance of time and cost, followed by utilization of a GA-based resource scheduling method to generate a feasible schedule which may satisfy all the project constraints.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>