<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T04:28:35Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/59232" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/59232</identifier><datestamp>2026-11-24T20:44:01Z</datestamp><setSpec>com_10356_982</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2152</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en">Ali Najafi</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en">Tiong Lee Kong, Robert</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en" authority="a6dec9ca-977d-49d3-af9e-2924bad6cbb7" confidence="600">School of Civil and Environmental Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned" lang="en">2014-04-28T01:38:31Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available" lang="en">2014-04-28T01:38:31Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en">2014</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en">2014</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="citation" lang="en">Ali Najafi. (2014). Modeling the productivity of precast concrete operations. Doctoral thesis, Nanyang Technological University, Singapore.</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri" lang="en">https://hdl.handle.net/10356/59232</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="doi" lang="en">10.32657/10356/59232</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en">Despite the extensive use of precast concrete (PC) elements in different construction projects such as high rise residential and commercial buildings, there is no study to provide details about the factors that affect productivity of PC erection (installation) process and model the productivity of the installation activities in an academic fashion. The thesis is organized to address this research gap. Primary data regarding installations of 303 PC elements (walls, columns, beams, and slabs) were collected through direct observation and several controllable and uncontrollable factors influencing the productivity of the erection process were identified. New hybrid models using Method Productivity Delay Model, Multiple Regression Analysis, Artificial Neural Networks, and construction simulation were developed to calculate the delay factor which was in turn used to form the final models to provide accurate estimations of the installation times of PC components. Based on the results, several suggestions are provided to increase the productivity of PC installation process and directions for future research are discussed.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en">Doctor of Philosophy (CEE)</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="extent" lang="en">192 p.</dim:field>
   <dim:field mdschema="dc" element="language" qualifier="iso" lang="en">en</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">DRNTU::Engineering::Civil engineering::Construction management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en">Modeling the productivity of precast concrete operations</dim:field>
   <dim:field mdschema="dc" element="type" lang="en">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="scopus">2026-11-24T20:43:59Z</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="wos">2025-08-13T01:36:51Z</dim:field>
   <dim:field mdschema="datacite" element="rights">open.access</dim:field>open.accessopen.access<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="98f8d7ec-bcff-4033-b4eb-abc78880a56d">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
	&lt;Language>en&lt;/Language>
   	&lt;Title>Modeling the productivity of precast concrete operations&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2014&lt;/PublicationDate>
   	&lt;DOI>10.32657/10356/59232&lt;/DOI>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Ali Najafi&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Civil engineering::Construction management&lt;/Keyword>
   	&lt;Abstract>Despite the extensive use of precast concrete (PC) elements in different construction projects such as high rise residential and commercial buildings, there is no study to provide details about the factors that affect productivity of PC erection (installation) process and model the productivity of the installation activities in an academic fashion. The thesis is organized to address this research gap. Primary data regarding installations of 303 PC elements (walls, columns, beams, and slabs) were collected through direct observation and several controllable and uncontrollable factors influencing the productivity of the erection process were identified. New hybrid models using Method Productivity Delay Model, Multiple Regression Analysis, Artificial Neural Networks, and construction simulation were developed to calculate the delay factor which was in turn used to form the final models to provide accurate estimations of the installation times of PC components. Based on the results, several suggestions are provided to increase the productivity of PC installation process and directions for future research are discussed.&lt;/Abstract>