<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T17:46:33Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/6548" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/6548</identifier><datestamp>2026-11-25T20:20:56Z</datestamp><setSpec>com_10356_986</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2218</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en">Li, Kunpeng</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en">Sivakumar A. I.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en" authority="50c1ae5d-dbc2-4261-8647-8a6bc78fd13d" confidence="600">School of Mechanical and Aerospace Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned" lang="en">2008-09-17T11:17:48Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available" lang="en">2008-09-17T11:17:48Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en">2005</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en">2005</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="citation" lang="en">Li, K. (2005). Synchronized scheduling of air transportation and assembly manufacturing in consumer electronics supply chain. Doctoral thesis, Nanyang Technological University, Singapore.</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri" lang="en">https://hdl.handle.net/10356/6548</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="doi" lang="en">10.32657/10356/6548</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en">The consumer electronics has been a booming industry in recent years. Motivated by the challenges confronted by a major PC manufacturer in consumer electronics industry, this research studies the problem of synchronizing the assembly manufacturing and the air transportation to achieve accurate delivery with minimized delivery cost. There are two integrated decisions involved in the research problem that determine: (1) proper allocation of orders to various available flights in the planning period (2) an appropriate release time for each order in assembly ensuring it can catch the allocated flight after assembly, and to minimize the waiting time between assembly and air transportation.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en">DOCTOR OF PHILOSOPHY (MPE)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">DRNTU::Engineering::Industrial engineering::Supply chain</dim:field>
   <dim:field mdschema="dc" element="title" lang="en">Synchronized scheduling of air transportation and assembly manufacturing in consumer electronics supply chain</dim:field>
   <dim:field mdschema="dc" element="type" lang="en">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="scopus">2026-11-25T20:20:55Z</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="wos">2025-08-13T00:21:47Z</dim:field>
   <dim:field mdschema="datacite" element="rights">open.access</dim:field>open.accessopen.access<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="35c01bdd-b963-437a-a224-40a969a090ad">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Synchronized scheduling of air transportation and assembly manufacturing in consumer electronics supply chain&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2005&lt;/PublicationDate>
   	&lt;DOI>10.32657/10356/6548&lt;/DOI>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Li, Kunpeng&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Industrial engineering::Supply chain&lt;/Keyword>
   	&lt;Abstract>The consumer electronics has been a booming industry in recent years. Motivated by the challenges confronted by a major PC manufacturer in consumer electronics industry, this research studies the problem of synchronizing the assembly manufacturing and the air transportation to achieve accurate delivery with minimized delivery cost. There are two integrated decisions involved in the research problem that determine: (1) proper allocation of orders to various available flights in the planning period (2) an appropriate release time for each order in assembly ensuring it can catch the allocated flight after assembly, and to minimize the waiting time between assembly and air transportation.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>