<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-27T17:56:16Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/6552" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/6552</identifier><datestamp>2026-11-23T21:33:46Z</datestamp><setSpec>com_10356_986</setSpec><setSpec>com_10356_19</setSpec><setSpec>com_10356_11</setSpec><setSpec>col_10356_2218</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en">Gupta, Amit Kumar</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en">Appa Iyer Sivakumar</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="school" lang="en" authority="50c1ae5d-dbc2-4261-8647-8a6bc78fd13d" confidence="600">School of Mechanical and Aerospace Engineering</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned" lang="en">2008-09-17T11:17:50Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available" lang="en">2008-09-17T11:17:50Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en">2006</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued" lang="en">2006</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="citation" lang="en">Gupta, A. K. (2006). Multi-objective dynamic scheduling of serial and batch manufacturing processes. Doctoral thesis, Nanyang Technological University, Singapore.</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri" lang="en">https://hdl.handle.net/10356/6552</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="doi" lang="en">10.32657/10356/6552</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en">The objective of this research is to characterize the control curves for the multi-objective dynamic scheduling (MODS) of serial and batch manufacturing processes. The pairs of conflicting objectives considered in this thesis are (1) mean cycle time and maximum tardiness, (2) mean cycle time and cycle time variance, and (3) earliness and tardiness related objectives. The motivation for using these conflicting objectives is to simultaneously incorporate the manufacturer&amp;apos;s as well as the customer&amp;apos;s concerns in scheduling. The interest of the decision maker lies not in just achieving a single optimal solution, but in defining a trade-off curve so that the decision maker can operate the scheduling along the trade-off curve according to the dynamic needs of the manufacturing shop.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en">DOCTOR OF PHILOSOPHY (MPE)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject" lang="en">DRNTU::Engineering::Manufacturing::Production management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en">Multi-objective dynamic scheduling of serial and batch manufacturing processes</dim:field>
   <dim:field mdschema="dc" element="type" lang="en">Thesis</dim:field>
   <dim:field mdschema="dc" element="format" qualifier="mimetype">application/pdf</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="scopus">2026-11-23T21:33:44Z</dim:field>
   <dim:field mdschema="cris" element="lastimport" qualifier="wos">2025-08-14T01:05:32Z</dim:field>
   <dim:field mdschema="datacite" element="rights">open.access</dim:field>open.accessopen.access<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="45249a01-5f95-4d5b-a815-140b5f556316">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Multi-objective dynamic scheduling of serial and batch manufacturing processes&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2006&lt;/PublicationDate>
   	&lt;DOI>10.32657/10356/6552&lt;/DOI>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Gupta, Amit Kumar&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Manufacturing::Production management&lt;/Keyword>
   	&lt;Abstract>The objective of this research is to characterize the control curves for the multi-objective dynamic scheduling (MODS) of serial and batch manufacturing processes. The pairs of conflicting objectives considered in this thesis are (1) mean cycle time and maximum tardiness, (2) mean cycle time and cycle time variance, and (3) earliness and tardiness related objectives. The motivation for using these conflicting objectives is to simultaneously incorporate the manufacturer&amp;apos;s as well as the customer&amp;apos;s concerns in scheduling. The interest of the decision maker lies not in just achieving a single optimal solution, but in defining a trade-off curve so that the decision maker can operate the scheduling along the trade-off curve according to the dynamic needs of the manufacturing shop.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>