<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T06:41:00Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/6607" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/6607</identifier><datestamp>2025-05-01T02:14:12Z</datestamp><setSpec>com_10356_5039</setSpec><setSpec>com_10356_2129</setSpec><setSpec>col_10356_5040</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Tong, Tee Hui.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en_US">Chen, Po-Han</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="research" lang="en_US" authority="d4afa55f-d745-4abc-bbdf-5a9becf5f9fb" confidence="600">Centre for Advanced Construction Studies</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2008-09-17T11:48:59Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2008-09-17T11:48:59Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2003</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2003</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/10356/6607</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The report describes an analysis programme conducted on road and infrastructure projects in Singapore. A survey was conducted on a sample of Project Management and Contract Administration individuals from various project teams to determine the factors affecting construction delays and their influence to the overall project duration. 'Multiple Regression' techniques were used to quantify the influence of independent variables that contribute to overall delays in construction. '</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Science (International Construction Management)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject">DRNTU::Engineering::Civil engineering::Construction management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Factors leading to delays in construction in infrastructure based projects</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="c95e697b-e6d6-4d54-b969-b9fa707d12e8">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Factors leading to delays in construction in infrastructure based projects&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2003&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Tong, Tee Hui.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Civil engineering::Construction management&lt;/Keyword>
   	&lt;Abstract>The report describes an analysis programme conducted on road and infrastructure projects in Singapore. A survey was conducted on a sample of Project Management and Contract Administration individuals from various project teams to determine the factors affecting construction delays and their influence to the overall project duration. &amp;apos;Multiple Regression&amp;apos; techniques were used to quantify the influence of independent variables that contribute to overall delays in construction. &amp;apos;&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>