<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-29T16:19:58Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/6699" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/6699</identifier><datestamp>2025-05-14T17:05:32Z</datestamp><setSpec>com_10356_5039</setSpec><setSpec>com_10356_2129</setSpec><setSpec>col_10356_5040</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Md Rashed Ali.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en_US">Jahidul Alum</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="research" lang="en_US" authority="6d73df97-0941-4d95-bc90-ab74cef01dae" confidence="600">Centre for Advanced Construction Studies</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2008-09-17T11:51:19Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2008-09-17T11:51:19Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2000</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2000</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">https://hdl.handle.net/10356/6699</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The Aim of this project is to study the feasibility of application of RMP in construction project capital budgeting. To accomplish this aim, the following objectives are set:-1. To investigate the use and application of RMP in preparing construction project cost estimation. 2. To apply the risk management process to capital budget estimates for a infrastructure construction project, and examines the benefit in monitoring and control of costs.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Science (International Construction Management)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject">DRNTU::Engineering::Civil engineering::Construction management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Application of risk management in infrastructure construction projects</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="2a80456c-42aa-454d-b57e-c173af6b5c23">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Application of risk management in infrastructure construction projects&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2000&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Md Rashed Ali.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Civil engineering::Construction management&lt;/Keyword>
   	&lt;Abstract>The Aim of this project is to study the feasibility of application of RMP in construction project capital budgeting. To accomplish this aim, the following objectives are set:-1. To investigate the use and application of RMP in preparing construction project cost estimation. 2. To apply the risk management process to capital budget estimates for a infrastructure construction project, and examines the benefit in monitoring and control of costs.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>