<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T06:00:38Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/6705" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/6705</identifier><datestamp>2025-04-30T20:08:08Z</datestamp><setSpec>com_10356_5039</setSpec><setSpec>com_10356_2129</setSpec><setSpec>col_10356_5040</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Oh, Kian Chok</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en_US">Tiong, Robert Lee Kong</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="research" lang="en_US" authority="d4afa55f-d745-4abc-bbdf-5a9becf5f9fb" confidence="600">Centre for Advanced Construction Studies</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2008-09-17T11:51:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2008-09-17T11:51:29Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2004</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2004</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/10356/6705</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The primary objective of this thesis is to evaluate the financing of the North-South Expressway Project from the equity holder's perspective. In regard to the financial evaluation method, Valuation-by-Components (VC) based on Downside CAPM approach is applied for the evaluation, since the estimate approach for required returns on equity is more appropriate for emerging markets. VC values have been obtained as results which show the financial viability of the project.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Science (International Construction Management)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject">DRNTU::Engineering::Civil engineering::Construction management</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Financial evaluation of the Malaysian North-South expressway project</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="70efa3ae-328e-4757-822d-1b61700e9ac4">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Financial evaluation of the Malaysian North-South expressway project&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2004&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Oh, Kian Chok&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Civil engineering::Construction management&lt;/Keyword>
   	&lt;Abstract>The primary objective of this thesis is to evaluate the financing of the North-South Expressway Project from the equity holder&amp;apos;s perspective. In regard to the financial evaluation method, Valuation-by-Components (VC) based on Downside CAPM approach is applied for the evaluation, since the estimate approach for required returns on equity is more appropriate for emerging markets. VC values have been obtained as results which show the financial viability of the project.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>