<?xml version="1.0" encoding="UTF-8"?><?xml-stylesheet type="text/xsl" href="static/style.xsl"?><OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd"><responseDate>2026-11-28T23:57:11Z</responseDate><request verb="GetRecord" identifier="oai:dr.ntu.edu.sg:10356/6718" metadataPrefix="dim">https://dr.ntu.edu.sg/server/oai/request</request><GetRecord><record><header><identifier>oai:dr.ntu.edu.sg:10356/6718</identifier><datestamp>2025-04-30T20:10:20Z</datestamp><setSpec>com_10356_5039</setSpec><setSpec>com_10356_2129</setSpec><setSpec>col_10356_5040</setSpec></header><metadata><dim:dim xmlns:dim="http://www.dspace.org/xmlns/dspace/dim" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:doc="http://www.lyncode.com/xoai" xsi:schemaLocation="http://www.dspace.org/xmlns/dspace/dim http://www.dspace.org/schema/dim.xsd">
   <dim:field mdschema="dc" element="contributor" qualifier="author" lang="en_US">Chinniah, Ravindran.</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="supervisor" lang="en_US">Ting, Seng Kiong</dim:field>
   <dim:field mdschema="dc" element="contributor" qualifier="research" lang="en_US" authority="d4afa55f-d745-4abc-bbdf-5a9becf5f9fb" confidence="600">Centre for Advanced Construction Studies</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="accessioned">2008-09-17T11:51:50Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="available">2008-09-17T11:51:50Z</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="copyright" lang="en_US">2003</dim:field>
   <dim:field mdschema="dc" element="date" qualifier="issued">2003</dim:field>
   <dim:field mdschema="dc" element="identifier" qualifier="uri">http://hdl.handle.net/10356/6718</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="abstract" lang="en_US">The North East Line (NEL)  of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd  reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The station excavation is 18m to 29m deep, and NEL tunnels are constructed approximately llm below the operational tunnels. Majority of the excavation is carried out in predominantly highly and moderately weathered sedimentary rocks of the Jurong Formation.</dim:field>
   <dim:field mdschema="dc" element="description" qualifier="degree" lang="en_US">Master of Science (International Construction Management)</dim:field>
   <dim:field mdschema="dc" element="rights" lang="en_US">Nanyang Technological University</dim:field>
   <dim:field mdschema="dc" element="subject">DRNTU::Engineering::Civil engineering::Geotechnical</dim:field>
   <dim:field mdschema="dc" element="title" lang="en_US">Contruction of underground subway for Outram Park Mass Rapid Transit station</dim:field>
   <dim:field mdschema="dc" element="type" lang="en_US">Thesis</dim:field>
   <dim:field mdschema="dspace" element="entity" qualifier="type">Publication</dim:field>
   <dim:field mdschema="datacite" element="rights">restricted</dim:field>restrictedrestricted<dim:field mdschema="cerif" element="openaire" authority="" confidence="-1">&lt;Publication xmlns="https://www.openaire.eu/cerif-profile/1.1/" id="71983e59-777b-4f1e-a85e-b43633623651">
	&lt;Type xmlns="https://www.openaire.eu/cerif-profile/vocab/COAR_Publication_Types">http://purl.org/coar/resource_type/c_1843&lt;/Type>
   	&lt;Title>Contruction of underground subway for Outram Park Mass Rapid Transit station&lt;/Title>
   	&lt;PublishedIn>
    	&lt;Publication>
      	&lt;/Publication>
   	&lt;/PublishedIn>
   	&lt;PublicationDate>2003&lt;/PublicationDate>
   	&lt;Authors>
      	&lt;Author>
        	&lt;DisplayName>Chinniah, Ravindran.&lt;/DisplayName>
         	&lt;Affiliation>
         		&lt;OrgUnit>
         		&lt;/OrgUnit>
         	&lt;/Affiliation>
      	&lt;/Author>
	&lt;/Authors>
   	&lt;Editors>
	&lt;/Editors>
    &lt;Publishers>
        &lt;Publisher>
            &lt;OrgUnit />
        &lt;/Publisher>
    &lt;/Publishers>
    &lt;Keyword>DRNTU::Engineering::Civil engineering::Geotechnical&lt;/Keyword>
   	&lt;Abstract>The North East Line (NEL)  of MRT tunnels cross under the existing, operational MRT East-West line at Outram Park station. The new construction involves forming the NEL station with in the 2nd  reserve zone of railway protection, excavation approximately 8 to llm from the operational tunnels. The station excavation is 18m to 29m deep, and NEL tunnels are constructed approximately llm below the operational tunnels. Majority of the excavation is carried out in predominantly highly and moderately weathered sedimentary rocks of the Jurong Formation.&lt;/Abstract>
	&lt;Access xmlns="http://purl.org/coar/access_right" 
    >
    &lt;/Access>
&lt;/Publication>
</dim:field>
</dim:dim></metadata></record></GetRecord></OAI-PMH>